In a joint venture with ITTA and INURTEMA, SISTEMA INGENIERIA has been awarded the drafting of the design for a new ocean outfall for the Ibiza WWTP. ABAQUA, the Balearic Agency for Water and Environmental Quality (www.abaqua.cat), called for the bids. The service consists of preparing the necessary documents to obtain all the licences, permits […]
Study of Alternatives and Preliminary Draft of the Infrastructure Networks of the Santa Monica ZDTI
SISTEMA INGENIERIA presented the “Study of Alternatives and Preliminary Draft of the Infrastructure Networks of the Santa Monica ZDTI (comprehensive tourist development area)” to the company Sociedade de Desenvolvimento Turistico das Ilhas de Boavista and Maio, S.A. in Sal Rei (Ilha de Boavista, Cape Verde). The project involved studying the location of the infrastructure areas […]
Third Set of Panama Canal Locks
SISTEMA INGENIERIA is working on the third set of locks for the Panama Canal. FCC INDUSTRIAL has hired the company to recalculate the air conditioning systems, LV and ducts of all the ancillary buildings forming the emblematic structure. Since September 2014, SISTEMA INGENIERIA has been working together with technical personnel from numerous companies to meet […]
Ocean outfall for discharging brine from the desalination of seawater in Cañada del Rio
The company FUERCAN, S.L. has commissioned SISTEMA INGENIERIA to design an “OCEAN OUTFALL FOR DISCHARGING BRINE FROM THE DESALINATION OF SEAWATER IN CAÑADA DEL RIO”. The project consisted of designing an outfall 400 mm in diameter for discharging brine into the sea. The total length of the outfall will be 1,271 m, of which 496 […]
Construction Design for the “Upgrading Works of the Ziguinchor–Tanaff–Kolda Route”
SISTEMA INGENIERIA has been hired by CORSAN CORVIAM SENEGAL to produce the construction design for the “Upgrading Works of the Ziguinchor–Tanaff–Kolda Route”. The works consist of widening and improving the current road of about 200 km, the RN-6, which links these locations, in the Casamance Region in southern Senegal. The work is promoted by the […]
Installations and completion of the ancillary buildings of the third set of Panama Canal locks, Pacific and Atlantic side
FCC INDUSTRIAL DE PANAMÁ, S.A. hired SISTEMA INGENIERIA to provide technical assistance for the “INSTALLATIONS AND COMPLETION OF THE ANCILLARY BUILDINGS OF THE THIRD SET OF PANAMA CANAL LOCKS, PACIFIC AND ATLANTIC SIDE”. The works consist of the on-site team and the central offices providing technical support to recalculate and size the low-voltage installations, air […]
Investing in Equatorial Guinea
In collaboration with CMC, SISTEMA INGENIERIA has produced the master plan for the industrial city of Mbini in Equatorial Guinea. The works consisted of a study and the urban and infrastructure design necessary for this major project, which will turn Equatorial Guinea into the industrial infrastructure leader in the region. Watch video
Construction of the 2nd Phase of Fuerteventura Desalination Plant IV
State of the Final Phase of the Construction of the 2nd Phase of Fuerteventura Desalination Plant IV. This project will increase water production by 14,000 m3/day with two latest-generation reverse osmosis racks. SISTEMA INGENIERIA is providing technical assistance services to the Construction Department of the Government of the Canary Islands.
Fuerteventura’s Hydrological Infrastructures
SISTEMA INGENIERIA has been awarded the contract for the “Creation of a Database of Fuerteventura’s Hydrological Infrastructures”. The contracting body is the Fuerteventura Council.
Drafting of the Layout and Construction Design of the Puerto del Rosario–La Caldereta Road
The Ministry of Public Works, Transport and Land Policy of the Government of the Canary Islands has awarded the “Drafting of the Layout and Construction Design of the Puerto del Rosario–La Caldereta Road, Island of Fuerteventura” to the joint venture comprising SISTEMA INGENIERIA, GIPIC, SUBTERRA and EVALUA after a public invitation to tender. The structure […]